// equipment

// services & equipment

01

The project of a two-storey warehouse

// Info

// About project

The warehouse consists of two interconnected buildings: the main warehouse building and an administrative two-storey building.

The main warehouse building has a rectangular shape in plan with dimensions in axes of about 180.6 m x 66.4 m and a height of about 9.5 m.

The administrative building of the warehouse has a rectangular shape in plan with dimensions in axes of about 32.5 m x 22.5 m and a height of about 7.4 m.

The projected height of the basement in the main warehouse building is 3.0 m.

The projected height of the basement in the administrative building of the warehouse is 3.0 m.

The height of the zero mark of the first floor of the main warehouse building is 0.0 m.

The height of the zero mark of the first floor of the administrative building of the warehouse is 0.2 m.

The minimum recommended overall dimensions of the building site are 240.0 x 120.0 m.

//characteristics

/ Full - 13 554,8 m²

/ Basement area - 250 m²

/ Approximate service life of at least 50 years (Grade 3).

/ The responsibility class of the building is 2.

/ The estimated outdoor temperature is 46 C.

/ Wind load - 38 kg/m².

/ Snow load – 224 kg/m².

/ The degree of fire resistance of buildings - 3

The minimum recommended number of rooms in an administrative building is 12.

The minimum recommended number of rooms in the basement is 18.

The layout, the area of the warehouse, the administrative building and the basement are indicated in the floor plans.

On the first floor of the administrative building, a security room, toilets, showers, changing rooms, stairs, lobby, recreation room, accounting, office, switchboard are designed.

Toilets, stairs, lobby, recreation room, offices, dining room, utility room are designed on the second floor of the administrative building.

Stairs, utility rooms, boiler room, water intake room are designed in the basement of the administrative building.

The layout of the first floor differs from the layout of the second floor and basement.

The technical floor (attic) in the administrative building is not provided.

//photos